Throw it away - Why you shouldn't keep your POC

"Proof of Concepts" are a vital part of many projects, particularly towards the beginning of the project lifecycle, or even in the pre-business case stages.

They are crucial for ensuring that facts are gathered before some particularly risk decisions are made.  Technical or functional, they can address many different concerns and each one can be different, but they all have one thing in common.  They serve to answer questions.

It can be tempting, whilst answering these questions to become attached to the code that you generate.

I would strongly argue that you should almost never keep the code that you build during a POC.  Certainly not to put into a production system.

I'd go so far as to say that planning to keep the code it is often damaging to the proof of concept; planning to throw the code away is liberating, more efficient and makes proof of concepts more effective by focussing the minds on the questions that require answers..

Why do we set out on a proof of concept?

The purpose of a proof of concept is to (by definition):

  * Prove:  Demonstrate the truth or existence of something by evidence or argument.
  * Concept: An idea, a plan or intention.

In most cases, the concept being proven is a technical one.  For example:
  * Will this language be suitable for building x?
  * Can I embed x inside y and get them talking to each other?
  * If I put product x on infrastructure y will it basically stand up?

They can also be functional, but the principles remain the same for both.

It's hard to imagine a proof of concept that cannot be phrased as one or more questions.  In a lot of cases I'd suggest that there's only really one important question with a number of ancillary questions that are used to build a body of evidence.

The implication of embarking on a proof of concept is that when you start you don't know the answer to the questions you're asking.  If you *do* already know the answers, then the POC is of no value to you.

By extension, there is the implication that the questions posed require to be answered as soon as possible in order to support a decision.  If that's not the case then, again, the POC is probably not of value to you.

As such, the only thing that the POC should aim to achieve is to answer the question posed and to do so as quickly as possible.

This is quite different to what we set out to do in our normal software development process. 

We normally know the answer to the main question we're asking (How do we functionally provide a solution to this problem / take advantage of this opportunity), and most of the time is spent focussed on building something that is solid, performs well and generally good enough to live in a production environment - in essence, not answering the question, but producing software.

What process do we follow when embarking on a proof of concept?

Since the aim of a POC is distinct from what we normally set out to achieve, the process for a POC is intrinsically different to that for the development of a production system.

With the main question in mind, you often follow an almost scientific process.  You put forward a hypothesis, you set yourself tasks that are aimed at collecting evidence that will support or deny that hypothesis, you analyse the data, put forward a revised hypothesis and you start again.

You keep going round in this routine until you feel you have an answer to the question and enough evidence to back that answer up.  It is an entirely exploratory process.

Often, you will find that you spend days following avenues that don't lead anywhere, backtrack and reassess, following a zig-zag path through a minefield of wrong answers until you reach the end point.  In this kind of situation, the code you have produced is probably one of the most barnacle riddled messes you have every produced.

But that's OK.  The reason for the POC wasn't to build a codebase, it was to provide an answer to a question and a body of evidence that supports that answer.

To illustrate:

Will this language be suitable for building x?

You may need to check things like that you can build the right type of user interfaces, that APIs can be created, that there are ways of organising code that makes sense for the long term maintenance for the system.

You probably don't need to build a completely functional UI, create a fully functioning API with solid error handling or define the full set of standards for implementing a production quality system in the given language.

That said, if you were building a production system in the language you wouldn't dream of having in incomplete UI, or an API that doesn't handle errors completely or just knocking stuff together in an ad-hoc manner.

Can I embed x inside y and get them talking to each other

You will probably need to define a communication method and prove that it basically works.  Get something up and running that is at least reasonably functional in the "through the middle" test case.

You probably don't need to develop an architecture that is clean with separation of concerns that means the systems are properly independant and backwards compatible with existing integrations. Or that all interactions are properly captured and that exceptional circumstances are dealt with correctly.

That said, if you were building a production system, you'd need to ensure that you define the full layered architecture, understand the implications of lost messages, prove the level of chat that will occur between the systems.  On top of that you need to know that you don't impact pre-existing behaviour or APIs.

If I put product x on infrastructure y will it basically stand up?

You probably need to just get the software on there and run your automated tests.  Maybe you need to prove the performance and so you'll put together some ad-hoc performance scripts.

You probably don't need to prove that your release mechanism is solid and repeatable, or ensure that your automated tests cover some of the peculiarities of the new infrastructure, or that you have a good set of long term performance test scripts that drop into your standard development and deployment process.

That said, if you were building a production system, you'd need to know exactly how the deployments worked, fit it into your existing continuous delivery suite, performance test and analyse on an automated schedule.

Production development and Proof of Concept development is not the same

The point is, when you are building a production system you have to do a lot of leg-work; you know you can validate all the input being submitted in a form, or coming through an API - you just have to do it.

You need to ensure that the functionality you're providing works in the majority of use-cases, and if you're working in a TDD environment then you will prove that by writing automated tests before you've even started creating that functionality.

When you're building a proof of concept, not only should these tests be a lower priority, I would argue that they should be *no priority whatsoever*, unless they serve to test the concept that you're trying to prove.

That is,  you're not usually trying to ensure that this piece of code works in all use-cases, but rather that this concept works in the general case with a degree of certainty that you can *extend* it to all cases.

Ultimately, the important deliverable of a POC is proof that the concept works, or doesn't work; the exploration of ideas and the conclusion you come to; the journey of discovery and the destination of the answer to the question originally posed.

That is intellectual currency, not software.  The important delivery of a production build is the software that is built.

That is the fundamental difference, and why you should throw your code away.

Thursday, August 29, 2013

Agile and UX can mix

User experience design is an agile developer's worst nightmare. You want to make a change to a system, so you research. You collect usage stats, you analyse hotspots, you review, you examine user journeys, you review, you look at drop off rates, you review. Once you've got enough data you start to design. You paper prototype, run through with users, create wireframes, run through with users, build prototypes, run through with users, do spoken journey and video analysis, iterate, iterate, iterate, until finally you have a design.

Then you get the developers to build it, exactly as you designed it.

Agile development, on the other hand, is a user experience expert's worst nightmare. You want to make a change to a system, so you decide what's the most important bit, and you design and build that - don't worry how it fits into the bigger picture, show it to the users, move on to the next bit, iterate, iterate, iterate, until finally you have a system.

Then you get the user experience expert to fix all the clumsy workflows.

The two approaches are fundamentally opposed.

Aren't they?

Well, of course, I'm exaggerating for comic effect, but these impressions are only exaggerations - they're not complete fabrications.

If you look at what's going on, both approaches have the same underlying principle - your users don't know what they want until they see something. Only then do they have something to test their ideas against.  Both sides agree, the earlier you get something tangible in front of users and the more appropriate and successful the solution will be.

The only real difference in the two approaches as described is the balance between scope of design and fullness of implementation. On the UX side the favour is for maximum scope of design and minimal implementation; the agile side favours minimal scope of design and maximum implementation.

The trick is to acknowledge this difference and bring them closer together, or mitigate against the risks those differences bring.

Or, the put it another way, the main problem you have with combining these two approaches is the lead up time before development starts.

In the agile world some people would like to think that developing based on a whim is a great way to work, but the reality is different. Every story that is developed will have gone through some phase of analysis even in the lightest of light touch processes. Not least someone has decided that a problem needs fixing.  Even in the most agile of teams there needs to be some due diligence and prioritisation.

This happens not just at the small scale, but also when deciding which overarching areas of functionality to change. In some organisations there will be a project (not a dirty word), in some a phase, in others a sprint. Whatever its called it'll be a consistent set of stories that build up to be a fairly large scale change in the system. This will have gone through some kind of appraisal process, and rightly so.

Whilst I don't particularly believe in business cases, I do believe in due diligence.

It is in this phase, the research, appraisal and problem definition stage, that UX research can start without having a significant impact on the start-up time. Statistics can be gathered and evidence amassed to describe the problem that needs to be addressed. This can form a critical part of the argument to start work.

In fact, this research can become part the business-as-usual activities of the team and can be used to discover issues that need to be addressed. This can be as "big process" as you want it to be, just as long as you are willing, and have the resources to pick up the problems that you find, and that you have the agility to react to clear findings as quickly as possible. Basically, you need to avoid being in the situation where you know there's a problem but you can't start to fix it because your process states you need to finish your 2 month research phase.

When you are in this discovery phase there's nothing wrong with starting to feel out some possible solutions. Ideas that can be used to illustrate the problem and the potential benefits of addressing it. Just as long as the techniques you use do not result in high cost and (to reiterate) a lack of ability to react quickly.

Whilst I think its OK to use whatever techniques work for you, for me the key to keeping the reaction time down is to keep it lightweight.  That is, make sure you're always doing enough to find out what you need to know, but not so much that it takes you a long time to reach conclusions and start to address them. User surveys, spoken narrative and video recordings, all of which can be done remotely, can be done at any time, and once you're in the routine of doing them they needn't be expensive.   Be aware that large sample sets might improve the accuracy of your research, but they also slow you down.  Keep the groups small and focused - applicable to the size of team you have to analyse and react to the data. Done right, these groups can be used to continually scrutinise your system and uncover problems.

Once those problems are found, the same evidence can be used to guide potential solutions. Produce some quick lo-fi designs, present them to another (or the same, if you are so inclined) small group and wireframe the best ones to include in your argument to proceed.  I honestly believe that once you're in the habit, this whole process can be implemented in two or three weeks.

Having got the go ahead, you have a coherent picture of the problem and a solid starting point for you commence the full blown design work.  You can then move into a short, sharp and probably seriously intense design phase.

At all points, the design that you're coming up with is, of course, important. However, it's vital that you don't underestimate the value of the thinking process that goes into the design. Keep earlier iterations of the design, keep notes on why the design changed. This forms a reference document that you can use to remind yourself of the reasoning behind your design. This needn't be a huge formal tome; it could be as simple as comments in your wireframes, but an aide mémoire for the rationale behind where you are today is important.
In this short sharp design phase you need to make sure that you get to an initial conclusion quickly and that you bear in mind that this will almost certainly not be the design that you actually end up with.  This initial design is primarily used to illustrate the problem and the current thinking on the solution to the developers. It is absolutely not a final reference document.

As soon as you become wedded to a design, you lose the ability to be agile. Almost by definition, an agile project will not deliver exactly the functionality it set out deliver. Recognise this and ensure that you do the level of design appropriate to bring the project to life and no more.

When the development starts, the UX design work doesn't stop. This is where the ultimate design work begins - the point at which the two approaches start to meld.

As the developers start to produce work, the UX expert starts to have the richest material he could have - a real system. It is quite amazing how quickly an agile project can produce a working system that you are able to put in front of users, and there's nothing quite like a real system for investigating system design.

It's not that the wireframes are longer of use. In fact, early on the wireframes remain a vital, and probably only coherent view of the system and these should evolve as the project develops.  As elements in the system get built and more rigidly set the wireframes are updated to reflect them. As new problems and opportunities are discovered, the wireframes are used to explore them.

This process moves along in parallel to the BA work that's taking place on the project. As the customer team splits and prioritises the work, the UX expert turns their attention to the detail of their immediate problems, hand in hand with the BAs. The design that's produced is then used to explain the proposed solutions to the development team and act as a useful piece of reference material.

At this point the developers will often have strong opinions on the design of the solution, and these should obviously be heard. The advantage the design team now have is that they have a body of research and previous design directions to draw on, and a coherent complete picture against which these ideas (and often criticisms) can be scrutinised.  It's not that the design is complete, or final, it's that a valuable body of work has just been done, which can be drawn upon in order to produce the solution.

As you get towards the end of the project, more and more of the wireframe represents the final product.  At this point functionality can be removed from the wireframe in line with what's expected to be built.  In fact, this is true all the way through the project, it's just that people become more acutely aware of it towards the end.

This is a useful means of testing the minimum viable product. It allows you to check with the customer team how much can be taken away before you have a system that could not be released: a crucial tool in a truly agile project.  If you don't have the wireframes to show people, the description of functionality that's going to be in or out can be open to interpretation - which means it's open to misunderstanding.

Conclusion

It takes work to bring a UX expert into an agile project, and it takes awareness and honesty to ensure that you're not introducing a big-up-front design process that reduces your ability to react.

However, by keeping in mind some core principles - that you need to be able to throw and willing to throw work away, you should not become wedded to a design early on, you listen to feedback and react, you keep your level of work and techniques fit for the just-in-time problem that you need to solve right now - you can add four huge advantages to your project.

  • A coherent view and design that bind the disparate elements together into a complete system.
  • Expert techniques and knowledge that allow you to discover the right problems to fix with greater accuracy.
  • Design practices and investigative processes that allow you to test potential solutions earlier in the project (i.e. with less cost) than would otherwise be possible, helping ensure you do the right things at the right time.
  • Extremely expressive communication tools that allow you to describe the system you're going to deliver as that understanding changes through the project.

Do it right and you can do all this and still be agile.